Saturday, August 14, 2010

End of Week One

Closing in the crawl space.

Mold eradicated and the cause eliminated, time to replace the sheetrock in the basement/TV taping room.


Kitchen demolition.


Ahem! First surprise. Well, not really. Rotted bean due to failed roof in the past. Never dealt with. No time like the present!






Soffits all coming out.



From the laundry/pantry into the kitchen.


Framed in for the washer and dryer. (Plumber was here!)











Kitchen demo begins.


The first for sure sign of the trouble in the beam above.



The cabinets were constructed on site, so they couldn't be saved to be used in the pantry. Just one base cabinet that will be my laundry sink.












No comments:

Post a Comment